Wednesday, October 27, 2010

Mini Project: Jetty Pipeline Repair ( 2 )

The confirmation of the shipping activity was cofirmed exactly on the day we started work. The ship had left less than one hour that morning, and my boss kinda undecided whether to proceed with the crane renting or not. Since lifting was the main activity, boss had to call and confirmed about the rental, and it was already 9.00 am.

The work carried out under mild weather throughout the day. It was definitely the type of temperature one would love to work under. I stayed there for the whole day, supervising and chatting with the company's supervisor about computer, games and electronic stuff. Cool indeed, even he is way too old for this age, but it seems that he knows much about those tech.

Following are the pictures during our first activity there.


Temporary Support


Wooden Block

Chain Block

Lever Block
Preparation of tools and equipment


The crane cannot park fully deployed due to the narrow bridge, thus only extend lifting side.



The temporary support was welded to the beam.

Far view

Lifting view from afar.

Lifting view from afar.

No comments:

Post a Comment