originally posted on remsauce.blogspot.com
As captured on 26 march 2011.
At the horizon, we can see some pile driver crane on duty. |
Closed for construction. Open for bright future. |
From what I saw, the site was still on civil basics engineering such as piling and site leveling. Nothing yet installed, but perhaps the prefabrication of pipings, mechanical instruments, is ongoing somewhere else. I would rate the civil aspects has reached third quarter final of their masterplan.
No comments:
Post a Comment