This is the sequel to Tank Storage Erection: Summary Part 1. This post shows mostly the painting jobs. This is the final review, so I included a short video for the testing of Firewater Pipe Line. And I'm done with it. I did not join the commissioning, but I am lucky enough to join the team from the kickoff through the part final. Great experience.
Here it goes.
Roof plate installation. |
Preparation to install roof manhole. |
General View for manhole cover. |
Roof plate installation in progress. |
General View for tank roof. |
Roof manhole installed. |
General View of tank roof plate. |
Touch Up and Painting. |
Tank Handrail installed. |
Tank Handrail installed. |
Touch Up for seam welding. |
Second Coat. |
Erecting Scaffolding for painting works. |
Scaffolding. |
Partial paint job done. |
Painting job in progress. |
me in red. |
Tank Numbering. |
Far View. |
Tank Handrail painting in progress. |
Tank Handrail painting in progress. |